A hybrid model of fuzzy goal programming and grey numbers in continuous project time, cost, and quality tradeoff

Date

2013-11-20

Advisors

Journal Title

Journal ISSN

ISSN

Volume Title

Publisher

Springer

Type

Article

Peer reviewed

Yes

Abstract

The purpose of this paper is to develop current mathematical models of cost, time, and quality tradeoffs in conditions that parameters of project activities are estimated uncertainly by grey numbers. In some projects like construction projects, activities can be done within a much shorter time by increasing in the resources, while project's cost may rise at the same time. In such situations, managers are usually required to determine the best combination of cost, time, and quality parameters of the activities, although their information regarding these parameters is limited and rather incomplete. The greyness of these parameters in the proposed method can aid managers to deal with these conditions. The most important aspect of the proposed model is that it considers uncertainty of the project planning data in the form of grey numbers. A combination of fuzzy goal programming and grey linear programming is also developed to solve the proposed model. Finally, this model will provide the managers with a stronger ability to face with uncertainty in project management and planning. The application of this model is examined in a numerical example. As its major finding, the model determines an optimal range in which the project managers can respond to intrinsic changes that may occur in the parameters during a project.

Description

Keywords

Citation

Hajiagha, S. H. R., Mahdiraji, H. A., and Hashemi, S. S. (2014) A hybrid model of fuzzy goal programming and grey numbers in continuous project time, cost, and quality tradeoff. The International Journal of Advanced Manufacturing Technology, 71 (1-4), pp. 117-126

Rights

Research Institute